My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27810
DRMS
>
Back File Migration
>
Report
>
REP27810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:37 PM
Creation date
11/27/2007 4:53:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982036
IBM Index Class Name
Report
Doc Date
6/9/1989
Doc Name
MESA GRAVEL PIT PN 82-036 1988-89 ANNUAL RECLAMATION REPORT
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ti: <br /> <br />ANNUAL RECLAMATION REPORT <br />MESA GRAVEL PIT <br />PEABODY COAL COMPANY <br />PERMIT N0. 82-036 <br />INTRODUCTION <br />The gravel from this operation is used at Peabody Coal Company's Seneca mining operations <br />for road construction and road maintenance. During this reporting period (June 1, 1988 to <br />June 1, 1989), no gravel was produced, but additional lands were disturbed. Also during <br />this reporting period, Peabody received a revision of the permit in May 1989 for a road. <br />The activity in Item 1 below, termed disturbed reclaimed area, refers to a portion of land <br />that was reclaimed in a previous report period but disturbed during this reporting period. <br />1. Location and number of acres affected during the report year <br />Annual Reclamation Map for locations. <br />RESPONSE: <br />Activity Acres <br />Topsoil removed ahead of active pit 8.3 <br />Active pit area advance 5.6 <br />Disturbed reclaimed area 0.7 <br />2. Location and number of acres reclaimed during the report year. <br />RESPONSE <br />There were 0.0 acres reclaimed this year. <br />See Exhibit 2.41 <br />3. The location ana number of acres in the various stages of reclamation (bac kfilled, <br />graded, topsoil replaced, revegetated). <br />RESPONSE <br />No reclamation activities have been done during the report year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.