Laserfiche WebLink
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 4 <br />5. Mill yard and access roads (123 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation $ 132 <br />c) Revegetate yazd (95 acres at $1,720/acre) $ 163 <br />d) Buffer, 28 acres ~ ~ <br /> Total... $ 295 <br />6. East Branch Reservoir shores (100 acres) <br />a) Dismantle $ 0 <br />b) Revegetate (4 acres at $1,720/acre). $ 7 <br />c) Fertilize shores (41 acres at $160/acre). $ 7 <br />d) Buffer, 28 acres $_ -0 <br /> Total... $ 13 <br />7. Horseshoe intake shores (2 acres) <br />a) Fertilize (2 acres at $160/acre, I application). $~ -0 <br /> Total... $ 0 <br />8. Ute Creek Reservoir shores (12 acres) <br />a) Fertilize (12 acres at $160/acre, I application). ~2 <br />Total... $ 2 <br />9. Tailing Deposition Area (2,464 acres) <br />a) Revegetate tailing (902 acres at $5,990/acre). ~ $ 5,403 <br />b) Flood control $ 416 <br />c) Revegetate perimeter road, trees and shrubs only <br /> (94 acres at $470/acre) $ 44 <br />d) Permanent use, Bypass/Canal road, 40 acres. $ 0 <br />e) Buffer, 1428 acres ~o <br /> Total... $ 5,863 <br />10. Gravel Pit and storage (54 acres) <br />a) Grading and site preparation $ 15 <br />b) Revegetate (35 acres at $1,720/acre) $ 60 <br />c) Buffer, 19 acres $-~ <br />Total... $ 75 <br />11. Railroad Gravel Pit (5 acres) <br />a) Grading and site preparation $ 3 <br />b) Revegetate (5 acres at $1,720/acre) $~ <br />Total... $ 12 <br />