My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27703
DRMS
>
Back File Migration
>
Report
>
REP27703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:33 PM
Creation date
11/27/2007 4:51:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/9/1995
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CLIMAX MOLYBDENUM CO. <br />Henderson Mine and Mill <br />Permit $ M77-342, 1994 Annual Report <br />March 8, 1995 <br />Page 2 <br />Area 9 - Mill Site Tailings Basin <br />The facility undertook a test to demonstrate the effectiveness of <br />4 inch spigots and leadoff deposition during summer, as compared <br />to 6 inch spigots to enhance dust control. The test was very <br />successful with the 4 inch spigot and leadoff operation wetting a <br />larger area of beach. We have determined that the primary <br />component of the enhanced dust control program was the leadoff <br />operation and will continue leadoff operation during periods of <br />high dusting potential. We have also modified water management <br />practices to allow a larger portion of the process water to be <br />maintained in the tailings impoundment, keeping more of the <br />tailing material submerged, while preserving adequate free board <br />for dam stability and flood control. <br />Another tailing dam bench was reclaimed, which included regrading <br />and seeding. <br />Reclamation near the south corner o <br />completed, improving the seepwater <br />the hardware work was completed the <br />with soil and seeded. <br />f the tailings dam was <br />collection in the area. Once <br />area was re-graded, covered <br />General Mill Site <br />The Grand County Weed Control Agent <br />ongoing noxious weed control for th <br />follows the guidance of and complie <br />Noxious Weed Control program. <br />S Y <br />was retained to provide <br />e Mill site. This program <br />s with the Grand County <br />Enclosed is the biennial recomputation of the estimated <br />Mine and Mill reclamation costs as specified by Permit <br />period 1995 - 1996. We will await your verification of <br />calculation before increasing our bond. <br />Sincerely, <br />~£~ <br />ones <br />Environmental Manager <br />CLIMAX Molybdenum Co. <br />:Henderson <br />for the <br />our <br />
The URL can be used to link to this page
Your browser does not support the video tag.