Laserfiche WebLink
<br />1995 SITE SPECIFIC RECLAMATION COSTS (thousands of;) <br />Site Total Dismantle Site Prep/ Fert. at Reveg. at Reveg. at Reveg. at Reveg. at Flood Totals <br /> Area Grading $160 $1,720 $2,370 $5,990 $470 Controls <br /> acres er acre er acre er acre er acre er acre $ x 1 000 <br />1. Mine site 172 0 177 - - 275 - - - 452 <br />2. Vent shaft 1 52 - 0 - - - - - 52 <br />3. Portal 28 37 - 4 5 - - - - 46 <br />4. Surface rail 121 5 68 12 - 85 - - - 170 <br />5. Mill yards/roads 123 0 132 - 163 - - - - 295 <br />6. East Branch Res. 100 - - 7 7 - - - - 13 <br />7. Horshoe Res. 2 - - 0 - - - - 0 <br />8. Ute Creek Res. 12 - - 2 - - - - - 2 <br />9. Tailing 2,464 - - - - - 5403 44 416 5863 <br />10. Gravel it 54 - 15 60 - - - 75 <br />11. RR Gravel pit 5 - 3 - 9 - - - - 12 <br />12. Contractor camp 9 - - 1 - - - - 1 <br />13. Borrow 4 - - 0 5 - - - - 5 <br />14. Powerline/refuse 17 0 10 2 5 - - - - 17 <br />15. Water line 8 0 2 1 2 - - - 5 <br />16. Tailing line 47 0 8 4 9 - - - 21 <br />17. East Br. flood bypass 5 - - 1 - - - - - 1 <br />18. Tailing bldg/road 45 - 8 - 10 - - - - 18 <br />19. Mill water line 31 - 5 3 14 - - - - 21 <br />20. Seep water 52 0 8 7 14 - - - - 28 <br />21. Soil stockpile 190 - - - 76 - - - - 76 <br />22. Spotted Doe 24 - - - - - - - 0 <br />23. Lost Creek 20 - - 0 0 - - - - 0 <br />Subtotal (x 1,000)... $7,176 <br />REVEGETATION COSTS MLRD Admin fee 3.5% $251 <br />Fertilize only $160 per acre TOTAL x 1 000 ... 7 427 <br />Subsoil $1,720 per acre <br />Fragmented Rock $2,370 per acre <br />Tailing $5,990 per acre <br />Trees/Shrubs only $470 per acre <br /> <br /> <br />T. Eastep 02/20/95 MLRD95.WK4 <br />