Laserfiche WebLink
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 6 <br />19. Mill water return line/Power line (31 acres) <br />a) Grading and site prepazation. <br />b) Revegetate (8 acres at $1,720/acre). <br />c) Fertilize slopes (16 acres at $160/acre, 1 application) <br />d) Buffer, 7 acres <br />Total... <br />20. Seep water canaUPump house (52 acres) <br />a) Dismantle. <br />b) Grading and site preparation. <br />c) Revegetate (8 acres at $1,720/acre). <br />d) Fertilize slopes (41 acres at $160/acre, 1 application) <br />e) Buffer, 3 acres <br />Total... <br />21. Topsoil stockpiles/roads (190 acres) <br />a) Revegetate (44 acres at $1,720/acre). <br />b) Buffer, 146 acres <br />22. Spotted doe area (24 acres) <br />a) Buffer, 24 acres <br />$ 5 <br />$ 14 <br />$ 3 <br />~o <br />$ 21 <br />$ 0 <br />$ 8 <br />$ 14 <br />$ 7 <br />$ 28 <br />$ 76 <br />~0 <br />Total... $ 76 <br />. $-0 <br />Total... $ 0 <br />23. Lost Creek Reservoir shores (588 acres)' <br />a) Permanent use road (5 acres) $ 0 <br />b) Revegetate (20 acres at $1,720/acre). $ 0 <br />c) Fertilize (95 acres at $]60/acre, 1 application) ~0 <br />Total... $ 0 <br />Sub-Total... $ 7,176 <br />24. MLRD Administration fee (3.5% of sub-total) $ 251 <br />TOTAL (thousands)... $ 7,427 <br />' Reservoir is currently not constructed nor is there a plan to construct in the near future. <br />Therefore revegetation and fertilization costs are not included. <br />