Laserfiche WebLink
Wiih DMG approval, the backfill water was pumped from the evaporation system collection pond <br />to the tailings impoundment. A total of 800,900 gallons of brine water was pumped to the tailings <br />impoundment. Due to the plant being down for 22 days 6.403,800 gallons was pumped to the <br />tailings from the back fill wells. <br />The depth to water at BF-4 was at 25.98 feet on I 1 /28/00. <br />Wells M- 19 and M-20 were pumped intermittently during the month of November. A total of 3.57 <br />acre feet of water was pumped from these wells during the month. <br />Sin e I~ <br />avid E. Lon <br />9 <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />