Laserfiche WebLink
VEGETATION PRODUCTION <br />• Sample 1l4m2 plots by harvest method. <br />• Sampling by lifeform as proposed by CDMG: annual grass, annual fort, perennial grass, <br />perennial fort. <br />• All samples dried according to standard practice. <br />• Minimum samples: 10 reference area, 10 reclaimed area. <br />• Maximum samples: 35 reference area, 50 reclaimed area. <br />• Achieve sample adequacy or 50 samples maximum. <br />SPECIES COMPOSITION/DIVERSITY <br />• Information derived from cover sampling in both reclaimed and reference area. <br />REPORT SUMMARIZING DATA FROM RECLAIMED AND REFERENCE AREA <br />• Introduction; discussion of methods, results of sampling. <br />• Statistical comparisons. <br />• Discussion and conclusions. <br />TECI~iNICAL REVISION TO RECLAMATION PERMIT <br />Modifications to permit document to inwrporate all revisions to revegetation plan <br />(including seeding dates, irrigation, seed mix, grazing). <br />Address CDMG concerns on vegetation sampling methods and revegetation success <br />criteria. <br />Bid <br />The following bid amount is 6iroken down by vegetation study and technical revision. <br />1) Cover Sampling, Vegetation Production, <br />Species Composition/Diversity, Report $4,000 <br />2) Technical Revision to Reclamation Permit ~ SQQ <br />TOTAL BID AMOUNT $4,500 <br />Please contact us if you have any questions about the vegetation study or technical revision. <br />The vegetation study will moat -ikely be conducted in July and the report and technical <br />revision completed in August Thank you for the opportunity to bid on this project. We look <br />forwazd to working with Coors Energy Company. <br />Sincerely, <br />Edith A. Savage <br />Principal <br />