Laserfiche WebLink
<br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />12. Topsoil adequately salvaged and stored? Y No additional topsoil was salvaged from the pik this <br />quarter. Topsoil and subsoil was replaced as required <br />to maintain berm around perimeter of pile. <br />13. Trash removed? Y <br />14. Additional comments? N <br />During the 4th quarter, 1993, construction of the West Ridge Waste Pile continued with gob generated from the <br />sediment pond at the Orchard Valley West Mine and from reject materal at the East Mine Crushing & Screening <br />facility. Excessive moisture in the sediment pond gob resulted in compaction deficiencies which wdl require <br />corrective action before additional construction can take place. Drainage control was monitored and maintained <br />throughout the quarter. <br />1 certify the above report as being accurate to the best of my belief and knowledge. <br />Signature-~"" <br />~-~o - ~~ <br />Date <br />