My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27075
DRMS
>
Back File Migration
>
Report
>
REP27075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:05 PM
Creation date
11/27/2007 4:40:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/10/1994
Doc Name
4TH QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' ~ ~ - <br />~~~ II~II~I~~I~~~ ~~~ <br />~ ~ q3 <br />ORCHARD VALLEY MINE <br />Gf ~~/~, QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />1. Quantity of waste material added to Y Approximately 756 tons of gob were added to the <br />waste disposal area this quarter? waste disposal pile this quarter. <br />2. Waste material deposited and compacted N Waste material was deposited and compacted during <br />in 24" lifts? the quarter in 24" lifts. However, wet material from the <br /> clean out of the OVWM sediment pond failed to meet <br /> compaction requirements and will need to be dug out, <br /> mixed with drier material, and redeposited. <br />3. Drainage alterations constructed? N No drainage alterations were constructed during the <br /> the quarter. 'flee existing drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage to ditches at the toe of <br /> the pile. <br />4. Present height of waste material? Highest height approximately 94.0 feet. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1 V:2H ouTSlopc? during construction. <br />7. Adequate drainage on top ofcompleted Y Grading was maintained on top of completed fill lifts to <br />till? ensure proper drainage from the top of the pile. <br />R. Bench drainage adequate? Y Bench drainage was maintained Throughout the quarter. <br /> See item 3. <br />9. Outslopes covered with 4' non-IOxIC, Y <br />non-combustblc material? <br />10. Berms constructed on outslopes? Y <br />11. Evidence of structural defects? N <br />
The URL can be used to link to this page
Your browser does not support the video tag.