Laserfiche WebLink
' 7 • • <br />5. Section A-A on the Reclamation Plan Map shows the expected water <br />surface elevations in Cells A and B. Please confirm that the WSEs ~G""C <br />for the two cells should be reversed on the diagram. (2li1 <br />,,. ~ 6. How much water is available from the Balmgartner Well Nos. 1 and 2 <br />~~i~° .tom for augmentation? If excess water is needed, where will it come ~,~~ <br />+~'~~ from? Please provide more specific information regarding physical <br />and legal availability of water to meet operational water <br />requirements. <br />Reclame~tion Costs (Exhibit L) <br />1. This estimate does not include any provision for mobilization and <br />demobilization of equipment, removal of plant facilities and <br />buildings, and other indirect costs. Please revise your estimate <br />to include these items. I would recommend that you increase your <br />estimate by the actual anticipated costs of removing plant <br />facilities and buildings plus a 15 percent allowance for indirect <br />costs. <br />MJB/eke <br />3941E <br />