My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26464
DRMS
>
Back File Migration
>
Report
>
REP26464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:40 PM
Creation date
11/27/2007 4:30:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
1999 AHR & ARR RECLAMATION REPORT
Annual Report Year
1999
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RECLAMATION REPORT <br />Coors Energy Company (CEC) continues to contract the services of both Cooper <br />Aerial Survey Company of Tucson, Arizona and BE&K/Terranext, LLC (Terranext) <br />in Lakewood, Colorado to supply the aerial survey and optical scanning/digitizing <br />services for the 1999 reclamation evaluation and tracking work. In addition to the <br />increased accuracy that has been brought to the overall process through the use of <br />these two firms and the latest mapping and drafting techniques, CEC continues to use <br />Terranext as a supplement and check on its understanding of the "reclamation <br />process". <br />No additional acreage was "disturbed" during 1999. Approximately 3.2 acres of <br />access road to the southeast of B-Pit was eliminated, with the excess spoils from the <br />road being used in the reclamation work at the south end of B-Pit, and the roadbase <br />used to recondition the other access road to B-Pit. Topsanding (placement of 2 feet <br />of topsand) was completed on approximately 15.3 acres of the former A-Pit and the <br />access road located north-northwest of the former A-Pit. A 2.6 acre tract to the south <br />of Topsand piles A-1 and B-1 was also reclaimed. A total of 17.9 acres (tlie 15.3 <br />acres of former A-Pit together with the access road, and the 2.6 acres south of the <br />topsand piles) were fertilized and seeded with a sorghum cover crop in the late spring <br />of 1999. Tlie same 17.9 acres were seeded with the approved reclamation seed mix <br />(see Permit) in early November. These acreage parcels are identified on the <br />Vegetation/Revegetation Map. <br />Tl~e reclamation summary at the end of 1999 is as follows: <br />RECLAMATION ACREAGE SUNIIv1ARY <br />Total area remaining to be reclaimed 200.7 acres <br />Total area reclaimed and re-vegetated 212.3 acres <br />Grand Total 413 acres <br /> <br />A hi R- 1998 <br />-114- <br />
The URL can be used to link to this page
Your browser does not support the video tag.