Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2002 Monthly Report <br />Page 2 <br />detection system yielding a monthly average of 20.32 gpad. <br />During December, the West Pit water treatment plant operated efficiently discharging a <br />total of 10,396,000 gallons (31.91 acre-feet) of water to Rito Seco Creek, a total of <br />823,600 gallons (2.53 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment, and seepage along Rito Seco Creek remained dry. <br />Table 1-December 2002 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-1 12/28/02 74.20 <br />M-10 12/28/02 25.74 <br />M-11 12/28/02 37.90 <br />M-11 R 12/28/02 45.07 <br />M-16 12/28/02 24.46 <br />M-17 12/28/02 33.17 <br />M-18 12/28/02 27.60 <br />M-19 12/28/02 24.67 <br />M-20 12/28/02 25.80 <br />M-21 12/28/02 18.42 <br />M-22 12/28/02 16.97 <br />M-23 12/28/02 45.81 <br />M-24 12/28/02 27.20 <br />M-25 12/28/02 Dry <br />M-26 12/28/02 18.33 <br />M-27 12/28/02 Dry <br />M-28 12/28/02 25.93 <br />M-29 12/28/02 27.55 <br />M-30 12/28/02 27.55 <br />M-31 12/28/02 44.67 <br />M-32 12/28!02 49.04 <br />M-33 12/28/02 45.80 <br />M-34 12/28/02 22.26 <br />BF-1 12/28/02 28.88 <br />BF-2 12/28/02 32.47 <br />BF-3 12/28/02 30.83 <br />