My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25317
DRMS
>
Back File Migration
>
Report
>
REP25317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:56 PM
Creation date
11/27/2007 4:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
3/31/1992
Doc Name
INSTRUMENTATION LOG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ; / • III III III III IIII III • <br />Instrumentation log <br />March 1992 <br />Author: Victor Gurule <br />3/2/92 <br />1 Worked on PLC to is to include the ball kibble addition to <br />the SAG Mill and Ball Mill. <br />2) Worked on the VGD control view screens to integrate the <br />plc modifications. <br />3) Moved the spare wire and lighting equipment from the lower <br />warehouse up to the mill warehouse. <br />4) Helped Ron Zumwalt get acquainted with the formtool <br />software package. <br />3/3/92 <br />1) Ran the Norton utilities Disk Doctor and Speed Disk on the <br />IBM computer in the control room. <br />2) Worked most of the after noon trying to install the DTK <br />computer onto the office network. <br />3) Calibrated the Tails Ph meter. <br />4) Made modifications to the ladder logic changing the Sag <br />ball addition to 40,000 KW. Also made changes to the Strip <br />and Grinding VGD screens. <br />3/4/92 <br />1) Ordered some spare parts and some cleaning equipment for <br />the computers. <br />2) Sent out panel to blazer electric in Pueblo. <br />3) Cleaned and calibrated the Titration room ph meter and the <br />cyclone feed ph meters. <br />4 Called up people at Allen Bradley Denver and Ryall. <br />electric and Minproc Engineers trying to get the missing 3 <br />megabytes of memory for the T35 <br />5) <br />3/5/92 <br />down day <br />i) Checked instrumentation for needed repairs. <br />2) Helped the electricians work on the crusher, checked most <br />
The URL can be used to link to this page
Your browser does not support the video tag.