Laserfiche WebLink
Additional Page <br />2001-2002 Annual Report <br />Pikeview Quarry <br />M-77-211 <br />Castle Concrete Company <br />Anniversary Date: May 27 <br />Included with this report are two maps. Map 1 shows the status <br />of the operation with respect to the land in various categories <br />involving older reclamation and mining. Map 2 shows the <br />locations of Base and Enhanced Reclamation work performed since <br />1996. The distinction between Base and Enhanced Reclamation is <br />described in detail in the permit. Basically, Enhanced <br />Reclamation is a publicly funded reclamation program that <br />addresses visual impact mitigation. The Base Reclamation is that <br />reclamation performed by Castle Concrete to comply with the <br />permitted plans. <br />Map <br />(Wording from 1998 report): This map shows the various features <br />within the quarry itself. Permitted lands east of the eastern <br />edge of the map are not shown on the map because there were no <br />changes in that area of sufficient significance to show on a <br />map. Therefore, for the eastern portions of the permit please <br />refer to maps in previous reports. <br />One action included this year in the eastern portion of the <br />permit is the installation of drop structures in the drainage. <br />Other than that, all features east of Map 1 and in the permit <br />are as they were in previous years. <br />Various categories and classes of land are shown on this map. <br />Please note that although the shading for Affected Land is <br />different from other shades and patterns, all land that is <br />shaded or indicated with a fill pattern is, in fact, affected <br />land. The affected land at this operation has reached its <br />maximum extent. Future expansion of this operation into <br />undisturbed land will be extremely minor, under current plans. <br />That is, under the current permit, this operation has expanded <br />to the largest extent. <br />UPDATE 1999: There was a minor increase in mining <br />acreage, but no increase in affected land. Following <br />is an inventory of the acreage of the various parcels <br />of land shown on this map. <br />Castle Concrete 2002 Annual Report M-77-211 Pikeview Quarry Page 1 of 7 <br />