Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />October 2003 Monthly Report <br />Page 2 <br />During October, the West Pit water treatment plant operated efficiently discharging a <br />total of 9,067,600 gallons (27.83 acre-feet) of water to Rito Seco Creek, a total of <br />543,300 gallons (1.67 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment, and seepage along Rito Seco Creek remained dry. The <br />monthly precipitation accumulation for October was 0.77 inches, with the largest <br />accumulation (i.e., 0.39") occurring on October 2na <br />Table 1-October 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 10/30/03 44.60 <br />M-6 10/30/03 Dr <br />M-7 10/30/03 Dr <br />M-8 10/30/03 Dr <br />M-9 ] 0/30/03 141.51 <br />M-10 10/30/03 25.87 <br />M-11 R 10/30/03 43.37 <br />M-12 10/30/03 179.42 <br />M-13R 10/30/03 l 31.14 <br />M-14 10/30/03 139.13 <br />M-15 10/30/03 82.67 <br />M-16 10/30/03 23.61 <br />M-19 10/30/03 24.90 <br />M-21 10/30/03 19.01 <br />M-22 10/30/03 17.17 <br />M-26 10/30/03 17. ] 2 <br />M-32 10/30/03 44.61 <br />M-33 10/30/03 45.35 <br />M-34 10/30/03 22.96 <br />BF-4 10/30/03 24.95 <br />BF-6 10/30/03 30.82 <br />LS-1 10/30/03 Dr <br />LS-2 10/30/03 Dr <br />LS-3 10/30/03 Dr <br />LD-1 10/30/03 Dr <br />LD-2 10/30/03 Dry <br />LD-3 10/30/03 Dry <br />