My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24144
DRMS
>
Back File Migration
>
Report
>
REP24144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 3:25:19 PM
Creation date
11/27/2007 3:54:21 AM
Metadata
Fields
Template:
IMP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Opening ID <br />Mine Name <br />Type of Feature <br />Excavated Dimension <br />Eroded Dimension <br />Present Dimension <br />Depth <br />Shape of Opening <br />Surficial Material <br />Depth to Bedrock <br />Drainage <br />Existing Access Deterrents <br />Preferred Closure Method <br />M -78 -082 <br />Mary Nevin <br />Main Hoist Shaft <br />6.00 X 8.00 Ft <br />6.00 X 8.00 Ft <br />6.00 X 8.00 Ft <br />200 <br />Rectangular <br />Mine dump <br />15 <br />N <br />Boards over collar <br />Puf Plug W/ Acess <br />r <br />Install a polyurethane (PUF) closure with a ventilation and drain pipe. Place <br />the bottom form at the 18.00 foot level of the opening according to <br />specifications. An accessway is required. The required thickness of PUF is <br />7.0 vertical feet. The estimated volume of PUF is 15.00 cubic yards. Place <br />approximately 32.0 cubic yards of common fill over the polyurethane foam <br />closure to specifications. <br />REVEGETATION REQUIREMENTS <br />All areas disturbed during reclamation work and any other areas specified in <br />these Special Conditions will be revegetated according to the Revegetation <br />Specifications in the General Bid Specifications. Commercial <br />fertilizer /Manure /Commercial fertilizer or manure is required for this project. <br />The Ponderosa Pine Spruce /Fir seed mix will be used on all areas. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor <br />construction activities and ensure that each work item is completed and <br />constructed to design specifications. The PROJECT MANAGER will be available <br />during regular business hours (8:00 A.M. to 5:00 P.M.) on weekdays. <br />Inspections will not be scheduled on weekend days or holidays without prior <br />approval of the PROJECT MANAGER. The following items must be observed and <br />approved by the PROJECT MANAGER before proceeding with additional work: <br />1. Excavated and trimmed footers for precast panels prior to panel <br />placement <br />2. Bottom form and access placement and workmanship prior to PUF <br />application <br />3. cable net fabrication and anchor installation prior to net <br />installation. <br />4. Anchor bolt or bar installation and grate framing configuration and <br />workmanship, prior to grate installation. <br />5. Monument workmanship and installation. <br />6. All final revegetation and site clean -up work. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.