Laserfiche WebLink
Doc Date:12/11/2001 III I II I II I II IIII III <br />sss <br />_~ <br />SECOND HALF 1995 SUBSIDENCE SURVEY REPORT <br />I. Survey Data <br />During the second half of 1995, subsidence survey data was collected periodically from <br />established monuments on Routt County Road 27 in those areas underlain by gate roads <br />or panel centers during periods of active mining (refer to Figure 1 for monument <br />locations). Table 1 provides a summary of the collected data for stations R1- R6 located <br />over the gate roads at the west end of the 1 Southwest longwall panel undermined in July <br />1994; for station R7 situated over the center of the 1 Southwest longwall panel <br />undermined in August 1994; for stations R8-R15 located over the gate roads on [he south <br />side of the 1 Southwest longwall panel undermined by the 1 Southwest longwall panel in <br />September 1994 and the 2 Southwest longwall panel in March 1995; for station R16 <br />situated over the center of the 2 Southwest longwall panel undermined in March 1995; for <br />stations R17-R20 located over the gate roads on the south side of the 2 Southwest <br />longwall panel undermined by the 2 Southwest longwall panel in March 1995 and the 3 <br />Southwest longwall panel in November 1995; and for station R-21 situated over the <br />center of the 3 Southwest longwall panel undermined in November 1995. During the <br />second half of 1995, monitoring of County Road sites associated with the 2 and 3 <br />Southwest longwall panels was completed. <br />• Sites R22-R25 located over the gate roads on the south side of the 3 Southwest longwall <br />panel undermined in November 1995 were destroyed during construction of the <br />trench berm sandstone cliff mitigation project. Data from stations E10, E11, and E12 <br />associated with the YVEA powerline is provided in this report along with data from <br />sandstone cliff monitoring stations C1-C8. <br />Additional survey information for the Fish Creek AVF 5000 line consisting of six points <br />established to verify that subsidence resulting from the mining of the 2 Southwest <br />longwall panel in December 1994 does not extend into the Fish Creek AVF is also <br />presented in this report. The 5000 line survey monument locations are depicted on Map <br />23A. <br />II. Maps <br />Monument locations are depicted on Figure #1 and Map 23A. The extent and sequence <br />of underground development during the period is presented as the Twentymile Coal <br />Company - Foidel Creek Mine monthly update map for the period ending 12/31/95. The <br />I Southwest longwall panel was initiated in July 94 and completed in December 94. The <br />Southwest longwall panel was initiated in December 95 and completed in June 95. <br />The 3 Southwest longwall panel was initiated in July 1995 and neazly completed in <br />• December 1995 as shown on the monthly update map. <br />Segments of Routt County Road 27, the Twentymile Sandstone rock outcrop, and the <br />1'VEA power Line undermined during the second half 199 reporting period are shown on <br />