Laserfiche WebLink
<br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSALAREA INSPECTIONREPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />12. Topsoil adequately salvaged and stored? Y No additional topsoil was salvaged from the pile this <br />quarter. Topsoil and subsoil was replaced as required <br />[o maintain berm around perimeter of pile. <br />13. Trash removed? Y <br />14. Additional comments? N <br />During the 4th quarter.1992, reconstruction of the West Ridge Waste Pile was continued to reestablish the pile's <br />utility as a disposal site. Material generated from the Orchard Valley West mine was added to the pile during <br />the quarter. Reconstruction work on the pile was completed in October. <br />I certify the above report~~,q~,~ng accurate to the best of my belief and knowledge. <br />to <br />