My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23817
DRMS
>
Back File Migration
>
Report
>
REP23817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:03 PM
Creation date
11/27/2007 3:49:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/2/1993
Doc Name
1992 4TH QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III IIIIIIIIIIIII III <br />999 <br />ORCHARD VALLEY MINE <br />_('"~ QUARTERLY WASTE DISPOSALAREA INSPECTIONREPORT <br />NEW WEST RIDGE PILE <br />~~~~ <br />Item Y/N Comments <br />1. Quantity of waste material added to Y Approximately 2~ 16 tons of gob were added to the waste <br />waste disposal area this quarter? disposal pile this quarter. Construction activities on the <br /> were completed by October 27, 1992. <br />2. Waste material deposited and compacted Y <br />in 24" lifts? <br />3. Drainage alterations constructed? N No drainage alterations were constructed during the <br /> the quarter. The existing drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage toditches at the toe of <br /> the pile. <br />4. Present height of waste material? Highest height approximately 67.0 fee[. Two lifts were <br /> laid at a maximum unwmpacted depth of two feet. The <br /> lifts were subse uentl com acted. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1V:2H outslope? during construction. <br />7. Adequate drainage on top of completed Y Grading was maintained on top of the exposed gob to <br />fill? ensure proper drainage from the top of the pile. <br />8. Bench drainage adequate? Y Bench drainage was maintained throughout the quarter. <br /> See item 3. <br />9. Ou[slopes covered with 4' non-toxic, Y <br />non-combustible material? <br />10. Berms constructed on outslopes? Y <br />11. Evidence of structural defects'! N <br />
The URL can be used to link to this page
Your browser does not support the video tag.