Laserfiche WebLink
~ ~ III IIIIIIIIIIIII III <br />999 <br />ORCHARD VALLEY MINE <br />_('"~ QUARTERLY WASTE DISPOSALAREA INSPECTIONREPORT <br />NEW WEST RIDGE PILE <br />~~~~ <br />Item Y/N Comments <br />1. Quantity of waste material added to Y Approximately 2~ 16 tons of gob were added to the waste <br />waste disposal area this quarter? disposal pile this quarter. Construction activities on the <br /> were completed by October 27, 1992. <br />2. Waste material deposited and compacted Y <br />in 24" lifts? <br />3. Drainage alterations constructed? N No drainage alterations were constructed during the <br /> the quarter. The existing drainage pattern was <br /> maintained around the perimeter of the pile to protect <br /> outslopes and direct drainage toditches at the toe of <br /> the pile. <br />4. Present height of waste material? Highest height approximately 67.0 fee[. Two lifts were <br /> laid at a maximum unwmpacted depth of two feet. The <br /> lifts were subse uentl com acted. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1V:2H outslope? during construction. <br />7. Adequate drainage on top of completed Y Grading was maintained on top of the exposed gob to <br />fill? ensure proper drainage from the top of the pile. <br />8. Bench drainage adequate? Y Bench drainage was maintained throughout the quarter. <br /> See item 3. <br />9. Ou[slopes covered with 4' non-toxic, Y <br />non-combustible material? <br />10. Berms constructed on outslopes? Y <br />11. Evidence of structural defects'! N <br />