My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23781
DRMS
>
Back File Migration
>
Report
>
REP23781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:02 PM
Creation date
11/27/2007 3:49:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
2/28/1992
Doc Name
1991 ANNUAL RECLAMATION REPORT text
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. CERTIFIED INSPECTION REPORTS - STREETER FILL <br />Reouirement <br />As per Rule 2.06, Special Categories, Colowyo is required to <br />inspect quarterly the Streeter Fill and submit certified <br />Inspection Reports. <br />Response <br />The Streeter Fill Inspection Reports contained in Exhibit <br />8 are submitted to satisfy the above requirements. <br />The reports indicate there has been no significant <br />changes noted in the survey monuments and the piezometer well <br />and no formation of any springs or seeps. <br />Various surface cracks in the topsoil resulting from <br />minor topsoil settling have previously been noted and <br />monitored, but no evidence of surficial slope failure has been <br />• noted. In summary, no significant changes have occurred in <br />1991. <br />4. CERTIFIED INSPECTION REPORTS AND ANNUAL SEDIMENT SURVEYS - <br />SEDIMENT PONDS <br />Reouirement <br />"In order to clarify specific regulatory obligations regarding <br />sediment pond certification and maintenance, as well as to <br />provide documentation on runoff and sediment generation, the <br />permittee has committed to: <br />A. Inspect the condition of all sediment pond embankments, <br />spillways and dewatering devices quarterly and, <br />B. Survey the sediment ponds to determine the actual volume <br />of sediment in each pond once a year after spring runoff. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.