Laserfiche WebLink
• Site Reclamation Activity <br />April 2009 - March 2005 <br />Page 3 <br />TERRY TUNNEL AREA - Plate No. 2 <br />During the 2004 reporting year, no additional acreage was <br />disturbed. <br />Activity at this site consisted of; <br />1) monitoring and maintenance of the reclaimed site. <br />Activities planned for 2005 are; <br />1) monitoring and maintenance of the reclaimed site. <br />• SUNNYSIDE BASIN (LAKE EMMA) AREA - Plate No. 2 <br />During the 2004 reporting year, no additional acreage was <br />disturbed. <br />Activity at the site consisted of; <br />1) monitoring and maintenance of the planted areas. This included <br />repairing some subsidence and replanting the disturbed area. <br />Planned activity for 2005 includes; <br />1) monitoring and maintenance of the planted areas. <br />