My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23295
DRMS
>
Back File Migration
>
Report
>
REP23295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:45 PM
Creation date
11/27/2007 3:40:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
11/12/1999
Doc Name
UPDATED MATERIALS SPCC CONTAINMENT PLAN URAD MINESITE AND HENDERSON MINE
From
CLIMAX MOLYBDENUM CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Henderson Mine SPCC/MCP May 1999 <br />• 10.0 UPDATING THE SPCC !MCP <br />It is a requirement of the CPDES water dischazge permit that Henderson Mine annually <br />review and update this plan. The Materials Containment and Spill Prevention Plan will <br />be updated by the Environmental Department at ]east annually or more frequently when <br />necessary to reflect changes in system design, standazd operating procedures, or use of <br />materials. Mine personnel should keep the Environmental Affairs Manager apprised of <br />changes as they occur so this plan contains current and accurate information at all times. <br />11.0 ONGOING PROJECTS AND SCHEDULE FOR IMPLEMENTATIOiV <br />During prepazation of this plan, several of the containments (see for example the Fuel <br />Island on the west side of No. 1 Pond) were noted to require routine maintcnance- <br />cleaning to remove debris, etc. All containment azeas should be inspected ancf cleaned <br />prior to the next annual update (May 2000). <br />Small cracks were noted within concrete containment structures at the used oil storage <br />facility. These cracks should be inspected periodically and monitored to make sure that <br />spills aze adequately being contained in the structure. Should the containment be <br />compromised by leakage through the cracks, Henderson management must be prc:pazed to <br />• use an epoxy sealer (or equivalent) to retazd leakage. The cracks will be re-inspected <br />prior to the annual update scheduled for May 2000. <br />Some room for improvement in general housekeeping was noted for the Llsed Oil <br />Building. This is more of a safety issue for workers as the floor was slightly slippery; <br />however, abuild-up of oily materials can get out-of--hand if not attended to on ~i regulaz <br />basis. The Used Oil Building will be inspected for housekeeping improvements during <br />the next annual update in May 2000. <br /> <br />za <br />
The URL can be used to link to this page
Your browser does not support the video tag.