Laserfiche WebLink
<br />• III IIIIIIIIIIIIIIII • <br />STATE OF CO~.ORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: 13071866-3567 <br />FAX: (3031632-8106 <br />July 22, 1993 <br />Mr. Ken Kluksdahal <br />Operations Manager <br />Battle Mountain Resources, Inc. <br />P.O. Box 310 <br />San Luis, CO 81152-0310 <br />Re: Review of San Luis Project <br />Phase II, Raise 1 Design Report <br />Battle Mountain Resources, Inc., File No. M-88-112 <br />Dear Mr. Kluksdahal: <br />o~' ep~o <br />ti~ 4 <br />Me <br />~ (~ <br />~ 1896 ~ <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Director <br />Allen Sorenson of our staff has reviewed the Phase II, Raise 1 Design Report prepared by <br />Steffen Robertson and Kirsten (U.S.), Inc. A copy of his report to me is attached. <br />Mr. Sorenson has identified problems with the geotechnical investigations and with the <br />desigrnin relation to suitability of the in-situ tailings as a foundation for the Phase II <br />upstream raises. <br />Please review these concerns and address each one to the satisfaction of the Division <br />before earth moving work begins on the actual raise. <br />Sincerely, <br />o~~s,~ <br />X Larry D. Oehler <br />Reclamation Specialist <br />LDOfbjw <br />Enclosure <br />cc: Andre Douchane <br />Alana Scott <br />Jim Stevens <br />Allen Sorenson <br />m:\oss\bjw\Ido <br />