Laserfiche WebLink
. 't--• <br />=. Page 2 <br />III. Collection Basin <br />° The 15' x 20' area will be sloped downwards toward the <br />CMP with diversion ditches #2 and #4 draining into the <br />basin (Figure B on Drawing A). <br />° The area will be graded so all runoff will drain into <br />the collection basin. <br />° The 15' x 20' area will be shotcreted so a 4 inch thick <br />base with 6 x 6- 4 x 4 welded wire reinforcement. <br />IV. Final Work on Area <br />° The reclamation will be restored in this area according <br />to Permits after final construction. <br />GST/jm <br />07/09/84 <br />