My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22489
DRMS
>
Back File Migration
>
Report
>
REP22489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:19 PM
Creation date
11/27/2007 3:28:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
6/10/1994
Doc Name
3RD PART TECHNICAL OVERSIGHT REPORT FOR THE SAN LUIS PROJECT TAILINGS DISPOSAL AREA PHASE II RAISE I
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Third Party Oversight 3 Weter, Waste & Lend, Inc. <br />San Luis Mine June 9, 1994 <br />1.3.3 Task 3 -Oversight of Field Testing Program <br />WWL reviewed current and previous (Phase I construction) quality assurance (QA) <br />' testing program results. Additionally, construction QA test results from the initial stages of <br />the Raise I Expansion (prior to WWL involvement with the project) were reviewed. Opinions <br />concerning the adequacy of testing and validity of the test results were provided to DMG with <br />the weekly reports. No tests were conducted by WWL. <br />1.3.4 Task 4 -Review of Related Technical Submittals <br />WWL reviewed technical documents prepared by BMRI as directed by DMG. WWL's <br />' technical opinions concerning these documents are provided in this report. <br />' 1.3.5 Task 5 -- Review of Final Construction Certifications <br />As directed, WWL reviewed the Final Construction Report (SRK, 1994) from the Raise <br />' I Expansion. WWL's technical opinion concerning that document are contained herein. <br />t 1.3.6 Task 6 -- Participation in Meetings with BMRI <br />WWL participated in a technical review meeting with DMG on November 2, 1993, and <br />' participated in informal telephone discussions with DMG as needed. Participation in additional <br />meetings will be as directed by DMG. <br />' 1.4 SCOPE OF REPORT <br />t Results of the oversight work outlined in the previous section are presented in this <br />report. This report was organized to address the key technical issues associated with the <br />Raise I Expansion, but keep discussion of the issues as brief as possible. For continuity, major <br />sections of the report generally correspond to the major tailings disposal facility components, <br />' rather than the work tasks conducted for the third-party review. Documents reviewed as part <br />of this work are listed in Section 7. <br />' Daily field engineer reports completed during construction oversight work ere presented <br />as Appendix A to this report. Weekly reports provided to DMG are included as Appendix B. <br /> <br /> <br /> <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.