Laserfiche WebLink
<br />• Plans for reporting period 6-89 to 6-90 include reclamation in <br />areas (L), (D) and (G). Waste removal will take place in areas <br />(A), (B), (LL), (SS) and (TT). Waste will be deposited in areas <br />(F), (G), (E) and (FF). <br />~~~~ ~~ <br />Marvin L. Berg, P.E. <br />Quarry Superintendent <br />Southwestern Portland Cement <br />MLB:Iw <br />• 5/15/89 <br />• <br />