My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22421
DRMS
>
Back File Migration
>
Report
>
REP22421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:16 PM
Creation date
11/27/2007 3:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/3/1992
Doc Name
INSTRUMENTATION LOG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' wniie to warm u nerore you couta caliAraLe iL. a=r.er i <br />finish the calf tion I checked the 4-20 signal going <br />into the PLC an very thing checked out f~. I found that <br />the wire going to the PLC terminal strip was not ohming out <br />properly. I replaced the wire and was able to get everything <br />working. <br />2) Lowered the speed control on the NaCN pump to the leach. <br />3) Modified VGD screen in order to accommodate the new <br />temperature sensor. <br />2/7/92 <br />1 modified two VGD screens the reagent2 and strip6. I added <br />these screen to the IBM compcater as well. Modified the VGD <br />data base to include several variables used for control on <br />the IBM VGD display. <br />2) Cleaned and calibrated the cyclone Ph probe. Calibrated <br />the titration room ph probe usingg fresh 8 and 11 buffers. <br />Had some fresh buffers made in tfie lab for the titration <br />room. <br />3) Replaced the zero speed switch probe on CV1. Ran the <br />conveyor for 30 mins and their doesn't seem to be any <br />problems with it. <br />4) Got the two new temperature indicators/thermostats for the <br />ball and SAG mill gear lube oil boxes. <br />5) <br />2/10/92 <br />1) Went through all the programming and the wiring on the <br />ball and SAG mill gear box temperature indicators and <br />controllers. Was able to get it to give a proper indication <br />on both meters. <br />2) Helped Larry move some motors and transformers into the <br />warehouse. <br />3) Allen and I got the CN titration machine working.. There <br />was a problem with the silver nitrate, it was contaminated by <br />some unknown means. <br />4) Cleaned all the Ph probes and calibrated the titration <br />room and the cyclone over flow ph probes. <br />2/11/92 <br />1) Worked on printing out labels on the laser printer. <br />2 Worked on organizing the conduit shelf. Started labeling <br />the conduit shelf. <br />3) Cleaned up and organized my office area. Moved my file <br />cabinet into my office. <br />4) Cleaned out the flour on the ware house. <br />
The URL can be used to link to this page
Your browser does not support the video tag.