Laserfiche WebLink
• during the following year (MLRD Stipulations Nos. 13 and <br /> 25, OSM Stipulations Nos. 13 and 10). <br />o A mine workings map showing the location and quantity of <br />mine water inflows and a table keyed to the mine map <br />which contains the source, quantity, duration and quality <br />(pH, specific conductance and temperatures) of ail <br />' inflows (MLRD Stipulation No. 13, OSM Stipulation <br />No. 13). <br />o A table containing records of water discharged from the <br />mine, consumed in the mine and imported for use within <br />the mine (MLRD Stipulation No. 13, OSM Stipulation <br />• No. 13). <br />Other stipulations outlined specific monitoring requirements to <br />reinforce and expand upon the hydrologic monitoring plan included <br />in the Mt. Gunnison Mining and Reclamation Plan. Hydrologic <br />monitoring data are submitted to the regulatory authorities <br />quarterly. <br />In subsequent discussions with the agency, it was agreed that the <br />annual hydrology reports would be prepared for a water year <br />(October 1 to September 30) to correspond with the USGS reporting <br />program. <br />~, <br />J <br />-2- <br />