Laserfiche WebLink
• I - Hydrologic Monitoring Activities <br />The hydrologic monitoring program at the Mt. Gunnison site was <br />initiated in 1974 with the completion of several groundwater <br />observation wells. The monitoring program has expanded <br />considerably over time. In Water Year 1982, the program entailed <br />extensive hydrologic monitoring including the following: <br />1. Continuous flow monitoring at eight stream gaging sta- <br />tions with quarterly water quality sampling. <br />2. Quarterly water quality sampling at three additional <br />surface water quality monitoring stations. <br />• 3. Monthly measurement of discharge, pH, temperature and <br />conductivity at twelve springs. <br />4. Quarterly measurement of discharge and water quality at <br />thirty-five springs. <br />5. Semi-annual measurement of discharge and water quality at <br />sixteen springs. <br />6. Monthly water level measurement for eighteen wells. <br />7. Quarterly water quality measurement at nine wells. <br /> <br />-8- <br />