Laserfiche WebLink
J - ~ <br />4. Table 3 titled, NPDES Discharge Points, the Sewage discharge point (023) did not <br />include solids-dissolved for the third quarter of 1994. <br />5. Table 3 titled, NPDES Discharge Points, the 7 North Angle Nell (024) is missing <br />monthly monitoring data for January 1994, and first quarter monitoring data. <br />6. Table 3A titled, Yampa River Alluvium and Surface Wziter Monitoring, no <br />monitoring data was submitted for YAW-1, YAW-2, YAW-S or YAW-6, Y-1 and Y- <br />2. <br />Other past-due reports that need to be submitted to the Division include; <br />1. 1995 Pond Inspections (first and second quarter). <br />2. 1995 Refuse Pile Inspections (first and second quarter). <br />3. AMOCO pipeline Stockpond As-built drawings (noted in complete inspection dated <br />July l2, 1995). <br />4. 1995 Semi-Annual Subsidence Report (first half of 1995). See page 2.05.6(6)-16Ra. <br />Please submit the items mentioned above by October 6, 1995. If you have any questions, <br />please do not hesitate to call. <br />Sincerely, <br />~~ . <br />~'~ S. <br />Erica S. Crosby <br />Environmental Protection Specialist <br />c:\eagle\950919 <br />