Laserfiche WebLink
1996 Annual Hydrology Report Responses <br />December I1, 1997 <br />Page 2 <br />information on the small sumps would not be required to be discussed in the <br />pemri[; and, therefore would not be discussed in the AHR. <br />4. There were exceedances for MB-3 during first quarter 1996, due to a storm <br />event that exceeded the 10-year 24-hour storm event, as identified on Table 6. <br />Page 20 of the AHR has been revised to reflect this. <br />5. Actual data collected from the North Fork Lower Station, as recommended by <br />CDMG, is included in Appendix C. MCC believes that it is unnecessary to <br />collect data from the lower station while the ponds are dischazging, unless <br />discharge limits may be exceeded. MCC understands that discharge limitations <br />aze set in the NPDES permit by the Water Quality Control Division to protect <br />the stream. If discharges are within effluent limitations, then the stream should <br />not be impacted. MCC has and will continue to take measurements at the <br />North Fork Lower Station as part of the regular monitoring prograzn if a <br />discharge sample has exceeded effluent limitations. <br />The other specific sources for constituent contributions between the upper and <br />lower North Fork stations have been incorporated into the permit in TR#80. <br />6. Table 15 has been updated with the revised CHIA calculations as presented in <br />the PHC Technical Revision. Please note that all discharges from the W WTP <br />are routed through MB-2R; therefore, the discharge is accounted for in the <br />NPDES reporting for MB-2R. Please also note that all mine water was routed <br />through MB-1 or MB-2R (or in the case of the direct discharge, was sampled <br />with MB-1); therefore, all mine water is accounted for in the NPDES reporting <br />for the two ponds. <br />No response is necessary. <br />8. As the Division has recommended, MCC has been evaluating the groundwater <br />monitoring network since the prepazation of the 1996 AHR to determine <br />whether wells should be replaced or discontinued. As you recall, we had <br />expressed our desire to evaluate the monitoring program during the meeting <br />with Jonathan Kelly of Wright Water Engineers, Inc. and you regazding MCC's <br />plans for the 1996 AHR, and requested your input. MCC would still like the <br />opportunity to complete this evaluation and make a proposal on a replacement <br />program based on data needs. <br />There is no evidence, from MCC's long history of drilling in this area, that <br />there is a deeper saturated interval in which to drill. Therefore, MCC does not <br />believe the Division's recommendation is viable. As discussed in [Ire Geology <br />and Hydrology sections of MCC's permit, there are many discontinuous lenses <br />