Laserfiche WebLink
Mountain Coa! Componv 2000 Annual Hydrology Report Wesl E!k Mine <br />• <br /> <br />Table 2 <br />Springs Water Monitoring Program <br /> Water Quality <br />Station Flow Field <br />Parametersr Lab <br />Anal ses=~ <br />S rin s Above the "F" Seam in the North Fork Draina a Basin <br />G-7 3 times er ear 3 times er ear Annuall <br />G-14 (decreed S rine #7) 3 times er ear 3 times er ear Annuall <br />G-16 3 times er ear 3 times er ear Annuall <br />G-22 (decreed S rine #3) 3 times er ear 3 times er ear Annuall <br />G-24 (decreed S rin #8) 3 times er ear 3 times er ear Annuall <br />G-26a 3 times er ear 3 times er ear Annuall <br />G-28a (20) 3 times er ear 3 times r ear Annuall <br />E14-1 3 times er ear 3 times er ear Annuall <br />24-3 3 times er ear 3 times er ear Annuall <br />26-I 3 times er ear 3 times er ear Annuall <br />27-I 3 times er ear 3 times er ear Annuall <br />S rings in or Below the "F^ Seam in the North Fork Draina a Basin <br />G-la 3 times er ear 3 times er ear Annuall <br />G-20 3 times er ear 3 times er ear Annuall <br />G-49 ((I) Jumbo S rin and Pi eline 3 times er ear 3 times er ear Annuall <br />CR-12 (decreed S rine #1'_) 3 times er ear 3 times er ear Annuall <br />IS-I 3 times er ear 3 times er ear Annuall <br />10-I 3 times er ear 3 times er ear Annuall <br />E 10-2 3 times er ear 3 times er ear Annuall <br />11-2 3 times er 'ear 3 times er ear Annuall <br />Resources above the "B" Seam on the Jumbo Mountain area in the North Fork Drain age Basin <br />G-25 ((15)lumbo S rine No. 2 Pond, decreed S rin #22) 3 times er ear 3 times er ear Annuall <br />G-30 (17) 3 times er ear 3 times er ear Annuall <br />G-31 ((I8) Jurnbo S rin No. 4 Pond, decreed S rin #23 3 times r ear 3 times r ear Annuall <br />G-35 ((3) Jumbo PL (Pipeline) & Spring No. 5, decreed <br />S rin #R) 3 times per year 3 times per year Annually <br />S rin s above the "E^ Seam in the Drv Fork Draina e <br />J-0 3 times er ear 3 times er ear Annuall <br />~ Field parameters include pH, conductivity, and temperature. <br />- For sites with less than five years of data: Annual analyses during the second sampling period include laboratory <br />analyses of pH, conductivity, total dtssolved solids (TDS), total suspended solids (TSS), calcium, magnesium, <br />sodium, potassium. SAR, hardness, bicarbonate, chloride, nitrate/nitrite, phosphate (P0:' as P), sulfate, iron (total <br />and dissolvedl, manganese (coral and dissolved), aluminum, arsenic (total recoverable), cadmium, copper, lead, <br />mercury (total recoverable), molybdenum, selenium (total recoverable), and zinc. All parameters were analyzed (or <br />their dissolved form unless stated otherwise. <br />' For sites wtth five or more years o(data: Laboratory analysis during the second sampling period will include TSS, <br />TDS, conductivity, pH and iron (dissolved and total). <br />• <br />83l-032.550 Page 7 Wright Water Engineers <br />