Laserfiche WebLink
Mountain Coo! Company 2000 Annual Hydrology Report Wesr E/k Mine <br />u <br />• <br />Table 1 <br />Surtace Water Monitoring Program <br /> Water Quality <br />Station Flow Field Parameters Lab Anal ses <br />North Fork Upper (USGS) Continuous 3 times per year Annually <br />North Fork Lower ----- 3 times per year Annually <br />Upper Sylvester Gulch Flume 3 times per year 3 times per year Annually <br />Middle Sylvester Gulch Flume Continuous 3 times per year Annually <br />Lower Sylvester Gulch ----- 3 times per year Annually <br />Minnesota Creek Lower Flume (USGS) Continuous 3 times per year Annually <br />Minnesota Creek Upper Flume (USES) Continuous 3 times per year Annually <br />Lower Dry Fork Flume Continuous 3 times per year Annually <br />Middle Dr}• Fork Flume Continuous 3 times per year Annuall}• <br />Upper Dry Fork Flume Continuous 3 ttmes per year Annually <br />Lick Creek Flume Continuous 3 times per year Annually <br />Lower Gribble Gulch 3 times per year 3 times per year Annually <br />Horse Gulch 3 times per year 3 times per year Annually <br />East Gulch, East of Horse Gulch 3 times per year 3 times per year Annually <br />Deep Creek, Upper Continuous 3 times per year Annually <br />Deep Creek, Lover Continuous 3 times per year Annually <br />Box Conyon 3 times per year 3 times per year Annually <br />Field parameters include pH, conducuvit}~ and temperature. <br />• <br />' For saes with less than five year of data: Annual analyses during the second sampling period (except for the N. Fork <br />sites during the third sampling period) include laboratory analyses of pH, conductivity, total dissolved solids (TDS), <br />total suspended solids (TSS), calcium, magnesium, sodium, potassium, SAR, hardness. bicarbonate, chloride, <br />nitrate/nitrite, phosphate (PO,"' as P), sulfate, iron (total and dissoWed), manganese (total and dissolved), aluminum, <br />arsenic (total recoverable), cadmium, copper, lead, mercury ([oral recoverable), molybdenum, selenium (total <br />recoverable), and zinc. All parameters were analysed for their dissolved form unless stated otherwise. <br />For sites with five or more years of data: Laboratory analysis during the second sampling period (except for the N. <br />Fork sites during the third sampling period) will include TSS, TDS, conductivity, pH and iron (dissolved end total). <br />83/-03?.550 Page 6 Wright Water Engineers <br />