Laserfiche WebLink
<br />• Mr. Craig Springer <br />Paye Two <br />March 8, 1988 <br />If conductivity cannot be stabilized by pumping or bailing, <br />or• if flow to the well is not improved by re-development <br />then a new well may be required <br />After the re-development and flushing have been completed, contact us <br />with the results so we can help determine the next appropriate step. <br />Please review these steps and contact me with any questions. <br />Sincerely, <br />ACZ INC. <br />.~~tiG~C <br />Eldon D. Strid <br />EDS:rce <br /> <br /> <br />~~ Inc <br />