• <br />5.4 Planting Plan <br />:~ <br />Wetland excavation will begin as soon as constructed bench hydrologic regime is properly <br />functioning to support wetland vegetation. Wetland soils and vegetation will be carefully <br />excavated so that materials are not unnecessarily disturbed by taking the upper 0.5 to 1 foot of <br />material. Special attention will be made to minimize root disturbance and to keep green <br />vegetation upright as it is directly transplanted to the mitigation area. If possible, excavation and <br />transplanting will be performed when plant materials are in a dormant, dry state. This strategy of <br />timing and not stockpiling excavated wetland materials will be carried through all mitigation <br />phases. <br />5.5 Irrigation Plan <br />No irrigation should be necessary. Irrigation water is available to supplement natural <br />groundwater should this be necessary during the vegetation establishment period. <br />5.6 As-Built Conditions <br />A final report will be submitted to the COE by project proponent within 60 days of completion of <br />each mitigation phase. Elements of this report will describe as-built status of constructed <br />wetlands (i.e., bench configuration), plantings, and erosion control practices. Representational <br />cross-section lines are depicted on the drawings MP-1 and RP-I respectively showing site grading <br />prior to mining and post reclamation (refer to Appendix B, S-1 for profiles). <br />5-2 <br />