Laserfiche WebLink
Bear Coal Company 12 December 6, 1994 <br />TABLE 2 CONTINUED <br />Northing Eastinq Elevation <br />STATION U23 <br />July, 1987 404,212.45 1,441,756.40 6143.78 <br />October, 1 987 404,212.44 1,441,756.41 6143.81 <br />June, 1988 404,212.50 1,441,756.44 6143.78 <br />November, 1988 404,212.51 1,441,756.44 6143.79 <br />July, 1989 404,212.57 1,441,756.45 6143.75 <br />November, 1989 404,212.64 1,441,756.43 6143.75 <br />July, 1990 404,212.67 1,441,756.43 6143.74 <br />November, 1990 404,212.81 1,441,756.42 6143.72 <br />July, 1991 404,212.80 1,441,756.50 6143.75 <br />November, 1991 404,212.83 1,441,756.46 6143.74 <br />July, 1992 404,212.92 1,441,756.46 6143.74 <br />November, 1992 404,212.92 1,441,756.46 6143.75 <br />June, 1993 404,213.04 1,441,756.45 6143.66 <br />October, 1 993 404,213.03 1,441,756.45 6143.71 <br />May, 1994 404,213.07 1,441,756.47 6143.70 <br />July, 1994 404,213.01 1,441,756.48 6143.71 <br />Sept., 199 4 404,213.01 1,441,756.48 6143.80 <br />November, 1994 404,213.02 1,441,756.50 6143.73 <br />Mean 404,212.78 1,441,756.45 6143.74 <br />On October il, 1993 UTE Engineering and Surveying established a <br />new slope stability monitoring station. This monument is located <br />on the hillside below the fan structure. This monument is a #5 <br />rebar with a 2-inch aluminum cap - set in concrete. This station <br />will be referred to as U-24. The values for U-24 are as follows: <br />STATION U24 <br />October, 1993 404,398.97 1,441,948.61 6083.54 <br />May, 1994 404,401.36 1,441,947.94 6082.55 <br />July, 1994 404,401.55 1,441,947.92 6082.48 <br />Sept., 1994 404,401.58 1,441,947.94 6082.48 <br />November, 1994 404,401.53 1,441,947.89 6082.43 <br />Mean 404,401.00 1,441,948.06 6082.69 <br />