Laserfiche WebLink
• <br />Bear Coal Company 11 December 6, 1994 <br />TABLE 2 CONTINUED <br />Northing Easting Elevation <br />STATION U19 <br />August, 1985 404,403.85 1,442,179.52 NA <br />July, 1986 404,403.93 1,442,179.46 6127.40 <br />November, 1986 404,403.93 1,442,179.46 6127.40 <br />July, 1987 404,404.05 1;442,179.53 6127.26 <br />October, 1987 404,404.12 1,442,179.47 6127.30 <br />June, 1988 404,404.01 1,442,179.59 6127.19 <br />November, 1988 404,404.12 1,442,179.50 6127.20 <br />SHIFT <br />July, 1989 404,404.42 1,442,179.33 6127.09 <br />November, 1989 404,404.39 1,442,179.36 6127.09 <br />July, 1990 404,404.35 1,442,179.44 6127.09 <br />November, 1990 404,404.31 1,442,179.46 6127.07 <br />July, 1991 404,404.37 1,442,179.49 6127.07 <br />November, 1991 404,404.42 1,442,179.42 6127.07 <br />July, 1992 404,404.52 1,442,179.42 6127.10 <br />November, 1992 404,404.52 1,442,179.39 6127.09 <br />June, 1993 404,405.08 1,442,179.31 6126.98 <br />October, 1993 404,405.96 1,442,179.43 6126.77 <br />May, 1994 404,406.50 1,442,179.29 6126.69 <br />July, 1994 404,406.92 1,442,179.20 6126.64 <br />Sept., 1994 404,406.91 1,442,179.18 6126.64 <br />November, 1994 404,406.98 1,442,179.23 6126.64 <br />MEAN 404,405.19 1,442,179.35 6126.93 <br />NOTE: Station U19 is a #5 Rebar along the access road to the <br />portal. The point was run over by equipment between <br />November, 1988 and July, 1989 resulting in a shift in <br />position. Note that the coordinates up to November, <br />1988 were consistent. The new means reflect the values <br />of July, 1989 through November, 1994. <br />