My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20247
DRMS
>
Back File Migration
>
Report
>
REP20247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:50 PM
Creation date
11/27/2007 2:50:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
Report
Doc Date
2/24/1993
Doc Name
LAKEWOOD BRICK AND TILE CO CHURCH PIT ANNUAL REPORT MLRB PN M-79-045 FEDERAL TAX ID 84-0247850
From
LAKEWOOD BRICK AND TILE CO
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ermittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date: <br />~ood Brick and 7y7e Co. • <br />M-79-045 <br />Church Pit <br />02/28/93 <br />Page 2 <br />(1 cont.) <br />operation in Stage I and 6.27 acres ± in Stage 0. The clay <br />face was advanced to the north into the area mined by the <br />gravel operation again this year. <br />Gravel - Jefferson County Road and Bridge Dept. is mining the <br />gravel under a lease. Gravel mining continued in Stage I & II <br />ahead of the clay operation, basically over the clay beds. <br />This is done in accordance with the approved plan. By mining <br />the gravel this way it is handled only once. The current <br />gravel operation has 8.32 acres ± in Stages I & II disturbed. <br />(2) No reclamation was required this year. None will be required <br />until mining for both materials is completed in any given <br />stage. <br />(3) Clay - Mining will continue is Stage I, no new area will be <br />disturbed this year. We will mine deeper into the clay veins <br />exposed in the past. We will also advance the face to the <br />north as more of the clay vein is exposed by the gravel <br />operation. This may mean we move into the southern end of <br />Stage II. Processing will continue in the Plant Site Area in <br />Stage 0, 3.77 ac. ±. <br />Gravel - Mining/stripping will continue in Stage 0 on the <br />north end of the clay operation. The sand and gravel operator <br />has disturb most of the area in Stage II above the clay vein <br />and will concentrate on mining to the top of the clay vein. <br />Should the sand and gravel be depleted on top of the clay vein <br />this year the mining will commence in Stage A as approved. <br />They do not expect to disturb any new land this year. <br />(4) No reclamation is called for during the next year. However, <br />if the gravel operator reached the north permit line a <br />section of sloping will be completed from the existing surface <br />to the top of the clay vein. This slope will be part of the <br />north slope into the floor of the pit. <br />(5) CURRENT CONTACT ~,• <br />James R. Murray <br />1325 Jay St. <br />Denver, Co 80215 <br />(303) 238-5313 <br />FEDERAL TAX ID. # <br />
The URL can be used to link to this page
Your browser does not support the video tag.