Laserfiche WebLink
J. Dillie <br />March 2, 1995 <br />Page 2 <br />Duplicates were collected at M-14 and the tailings pond for quality <br />control. Field blanks and rinse blanks were conducted as part of the <br />field quality assurance program. The five process points were sampled. <br />Wells M-2, M-6, M-7, and M-8 and the three lysimeter pairs were checked <br />and found to be dry. <br />Sincerely, <br />Sally ayes <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />Alana Scott <br />