Laserfiche WebLink
VII. FUTURE MATERIALS CONTAINMENT /SPILL PREVENTICIN <br />. PLANS and UPDATES <br />Procedures or systems for new or remodeled oil and hazardous subst;3nces <br />facilities will be described in this Materials Containment Plan. It is a <br />requirement of Henderson mill's state water discharge permit that an annual <br />review and update be conducted. Mill personnel should keep the <br />Environmental Affairs Manager apprised of changes as they occur so this <br />plan contains current and accurate information at all times. <br />The SPCC 1 MCP will be updated by the Environmental Department staff <br />annually or when necessary to reflect changes in the standard operating <br />procedures for the plant, changes in the use of materials, or significant <br />changes in the design of the treatment system. <br />• <br />i <br />Page 18 <br />