Laserfiche WebLink
<br /> <br /> <br />Waste Bank No: ~r1.e_ ~Pi7'/Pr->~~,t~a P7 r ~T// - ~ - C~ 9 ~o~ ~o?f~-~ I <br />General Description or Reference to Site Plan: <br />~( Golden Eagle - E:thibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />^ New Elk -Exhibit 30, pages 2.05-27 through 2.054 <br />Activity During Inspection: ~ ~~,,.~~ <br />^ Removal of Topsoil or Organic Matter ^ Placement of Underdtain(s)• <br />0 <br />^ InsWlation of Surface Drainage Systems ^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or dischazge, <br />integriry of 100-year 24-hour appurtenant drainage structures, evidence of positive drainage. <br />_ /V~ e vr~r~ / S~orrhy 5 {4/~ /' ~ s ~~ ~1~. <br />j-~o s~ f ~ ~s~/.J/„~ ~ BOO ~ye,-,.~ Sur~'~- l'/y~~S fj-eui~ ~S ~ ~ ~ s ~`~ .. <br />-- ~,e/rf'Kp~ OPdAia/9 Lja 5 /~// /~Jot/r7/µra/P~ <br />Observations oP Fill Coastructiop: Include description of material, compaction, lift thicknesses, slopes of sides <br />and faces, construction methpdology. •~,,, <br />r ~JJ.,~ <br />• <br />Page 1 of 2 <br />Basin Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rules 4.09(11) and 4.10 (2)(2) <br />