Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />-~ <br />BASIN <br />RESOURCES, inc. <br />RECEIVED <br />MAY 131897 <br />Ahlolgn PI MinaralB P AePla@y <br />a subsidiary of ENTECH, Inc. <br />May I, 1997 <br />Mr. Kent Gorham <br />Colorado Division of Minerals & Geology <br />1313 Sherman S(ree[, Room 215 <br />Denver, Colorade 80203 <br />Re: Golden Eagle Mine: Pennit No. C-81-013 <br />Quarterly Waste Bank Inspection, Is[ Qtr-1997 <br />Dear Mr. Gorham: <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />(719)868-2761 <br />Purchasing (719) 868-2768 <br />Fax (719) 868-2275 <br />Enclosed is the firs[ quarter, 1997 Refuse Pile Inspection for [he Golden Eagle Mine. The refuse pile was <br />well maintained and stable. Placement of final cover is pending approval of Technical Revision 43. <br />The certification is on the back page of the report. <br />Please contact me if you have any questions. <br />SiryeE~ely, ~~ <br />Ronald G. Thompson <br />Property Manager <br />