Laserfiche WebLink
<br />• III IIIIIIIIIIIII III i <br />ANNUAL REPORT <br />TO <br />MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />STATE OF COLORADO <br />OF <br />MOBILE PREMIX CONCRETE CO., INC. <br />SPECIFICATION AGGREGATES QUARRY <br />REFERENCE 1. <br />I ': t091V •~~ <br />~:I~.~... z_. <br />I ~ L~ 1 J ~~80 <br />R`iiJF..u LF~(•JD RcCLAfV~/~TION <br />Golr,. Depl. of IJatural Resources <br />A. Permit No. 74-4C Development and Extraction Mining <br />Permit of the Mined Land Reclamation Board dated <br />February 15, 1977 with amendment to this permit dated <br />April 25, 1979 including Parcels 3 and 4. Copy of <br />the letter dated April 26, 1979 confirming approval `~~f <br />of the amendment is attached herewith. T <br />B. Rules and Regulations, Colorado Mined Land Reclamation <br />Board (July 1978) Paragraph 2.4 Annual Reports. <br />GENERAL INFORMATION <br />There is a change for this year in the name of the Owner and Operator from <br />Holloway Companies, Specification Aggregates, Inc. to Mobile Premix Concrete <br />Company, Inc., Specification Aggregates Quarry. Copy of letter dated <br />January 26, 1979 attached. There is no change in the Type and Location <br />of the Mine. Also there have been no changes of substance in the mining or <br />processing procedures except for the maintenance and improvements of the <br />processing equipment. <br />REFERENCE 2. <br />Submitted herewith is a Topographic Map (Scale 1 inch to 100 feet) of the <br />mining area, prepared by the Falcon Air Map Company, showing the topographical <br />characteristics of the Area on October 13, 1978. Property boundaries are <br />located on this map as well as the boundaries of the affected areas, which <br />are Parcel 1 in the processing area and Parcels 2, 3, and 4 of the mining area. <br />Also is one aerial photo size 8 1/2 x 11 inches (Scale 1 inch to 66~ feet). <br />Flown October 26, 1979 and showing all affected areas with land boundary <br />and all parcel boundaries. No specific reclamation was contemplate~i nor <br />projected for completion on this anniversary date of the permit. The <br />reclamation plan is directly related to the extraction of the rock in the <br />mining area and the extraction is ahead of the projected schedule. Con- <br />sequently, there is nothing indicated on the maps with reference to completed <br />phases of the reclamation plan. Also at this time there is nothing to <br />justify altering of the reclamation timetable. <br />Paragraph 2.4 <br />(1) There have been changes in the location and number of acr~=_s <br />affected during the past year. The mining operations have been <br />confined to areas which had been previously affected in f~~rmer <br />years and now includes Parcel 3. <br />(2) There have been no acres reclaimed during the past year. <br />(3) The number of acres in various stages of reclamation is a~~prox- <br />imately 55 acres, all within Parcels 2 and 3. <br />(4) There has been no revegetation during the past years. <br />(5) There has been no use of fertilizers, organic material, o:r soil <br />conditioners during the past year. <br /> <br />