Laserfiche WebLink
.. <br />• A report identifying the crushing days of operation and identifying <br />all days on which the detonation of blasting materials within 200' <br />of ground surface is included in this annual report. <br />Also included is a progress report on the reclamation identifying <br />areas being reclaimed, the areas in which reclamation is complete <br />and the success and failure of these efforts. Also included in <br />this annual report is a report on the seismic monitoring of the <br />operation. <br />This report also includes a summary of transportation activities on <br />how material was transported off the site. We would request that <br />all the information contained herein remain confidential and <br />precluded from disclosure until the mining operation is terminated. <br />Hydrology: we are not aware of any adverse impacts of the <br />operation on the hydrologic cycle. There is no significant erosion <br />problem and any sedimentation collected has been reused in topsoil <br />applications to sustain new plant life. It is our opinion that the <br />operation is sensitive to this cycle and has improved vegetation. <br />Complaints: Any complaints directed specifically to Asphalt Paving <br />Co. have been dealt with properly and in a timely manner so as to <br />eliminate any potential problems that may arise. This Company <br />recognizes its responsibility to constantly be aware of any and all <br />• suggested methods for improvement and pledges its continued best <br />effort for a professional operation. We would note, however, we <br />are not aware of any specific complaints directed toward Asphalt <br />Paving Co. involving any of our Quarry activities. <br />Asphalt Paving Co. appreciates the opportunity to discuss this <br />operation with you. we are convinced that our relationship with <br />the Zoning Department and the Board of Adjustment is the reason it <br />works so well. <br /> <br />„r,~,,,.~~.. ~ <br />