Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 5 <br />Date: 9/27/01 <br />Time: 4.0 <br />Mileage: 42 <br />Engr.lTech: BDL <br />Work Performed: <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 201 through 205 <br />on the material being placed in the refuse coal pile. <br />Twentymile Coal Company crews had placed and compacted processed waste coal in Area #2 of the Refuse <br />Pile. We obtained a moisture sample at each test location and a bulk sample of the material was obtained and <br />delivered to our laboratory for checkpoint Proctor determination. The checkpoint matched Proctor No. 2. <br />Remarks: <br />The material tested generally met project the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Co. was notified of today's test results. <br />