Laserfiche WebLink
STORMWATER ANNUAL REPORT -SAND AND GRAVEL <br />Permit Cert. No. COG-50 <br />Second Inspection - Datel l /7 A6. Findings, and action taken: <br />The ~71t Wd5 1nS612Cted a j~aV 1 ~caya anri avar~}hinn mac fnimrl <br />to );e okay. No action was needed <br />Other Inspections -Date 8 / 7/06 Findings, and action taken: <br />Fu1 insf:ection was done by the Division of IKinerals and Geology and <br />everything was found to be okay. No action was needed. <br />C. Results and interpretation ojany stormwater monitoring performed. Attach a separate sheet with the lab <br />results. (Monitoring is not a requirement under the permit, unless you were specifically directed to do so by the <br />Division. However, the results of any s[ormwazer monitoring thaz you performed on your own should be reported <br />here.) <br />Monitoring Results Attached? ^ No ^ Yes <br />D. Certification <br />"l certify under penalty of law that this document and all attachments were prepared under my direction or <br />supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the <br />information submitted. Based on my inquiry of the person or persons who manage the system, or those persons <br />directly responsible for gathering the information, the infornazion submitted is, to the best of my knowledge and <br />belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br />of Petmittce (legally responsible person) Date Signed <br />Keith Nienhueser Vice-President <br />Name (printed) Title <br />Usc additional pages as needed. Page 2 of 2 ,noel, <br />