My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-26_REPORT - M2001018
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001018
>
2007-03-26_REPORT - M2001018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:35:39 AM
Creation date
11/27/2007 2:30:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001018
IBM Index Class Name
Report
Doc Date
3/26/2007
Doc Name
Annual Fee/Report/Map
From
Nienhueser Construction & Excavating Co
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i..~ <br />STORMWATER ANNUAL REPORT -SAND AND GRAVEL <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies ofform jor each reporting year. Or go to <br />http: //www. cdphe. state. co. us/wg/Permits Unit/wgcdpmt. hhnl <br />Check if this is a <br />new name, address, etc. <br />Pennittee(CompanyName): _ Nienhueser Construction tk Excavatinx Co. _ <br />Facility Name: Sshw;.acher II <br />Mailing Address: P.O. 1soa 173, Sidney, NE. 69162 <br />Facility Phone Number: f 30& ) 254-3453 <br />Permit Certification No. COCr501232 - <br />Reporting Period: Jan. 1-Dec. 31, 20 G 6 (Form is due by Feb. I S of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements made <br />in any of your Best Management Practices (BMPs), employee training, spills, other problems encountered, etc. <br />How is your plan working?) <br />[ve hauled out 2625 vds from the pit this year. The rainfall was minimal <br />and has not caused any runoff. <br />Were changes made to your SWMP? ~ No ^ Yes -Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, hndines, and action <br />taken. (The permit requires at least lwo comprehensive facility inspections per year -see page 8 of the permit. <br />Include here a summary of those inspections, plus any other comprehensive inspections made. It is not necessary <br />to summarize day-to-day inspections, unless significant problems were noted.) <br />First Inspection -Date ~,/;tQ/~ Findings, and action taken: <br />The uit was inspected and everything was okay. No action was taiten <br />Note -form may be reproduced Page 1 of 2 uc,vao- <br />
The URL can be used to link to this page
Your browser does not support the video tag.