Laserfiche WebLink
t). To date, permanent revegetation as described in the mining and reclamation plan has <br />occurred at the Carbon Junction Mine at the permanently reclaimed spoils area. <br />Additional Information <br />The following CDMG permitting actions or revisions were undertaken in 2004. <br />Technical Revision 12 <br />This TR comprised a modification to the permit boundary and revisions to the <br />reclamation plan required by the withdrawal of the Fow Corners Material Ewing Mesa <br />#I Mine amendment #1. The TR was submitted on September 22, 2003 and approved on <br />July 8, 2004. <br />Phase UII/lII Bond Release Application (SIrf12) <br />On July 26, 2004 an application for Phase I, II, and III bond release was submitted to <br />CDMG. The bond release request requested acknowledgement and release of liability for <br />areas of the Carbon Junction Mine that were ceded to the Fow Comers Materials Ewing <br />Mesa #1 Operation where mining and reclamation obligations and liability are covered <br />under the CDMG permit issued to Fow Corners Materials for that operation. The release <br />is fot 64.51 acres of the Carbon Junction permit area that includes the South Pit and <br />ancillary areas. On October 12, 2004 the application was found complete by CDMG and <br />on November 9, 2004 CDMG conducted the bond release inspection. Final disposition of <br />the bond release request is pending. <br />The CDMG annual reclamation report form is appended. If any additional information is <br />required, please call me. <br />Sincerely, <br />Michael S. Savage <br />Principal <br />cc: Sandra Pautsky, Oalo-idge Energy <br />Matt Gavin, Goff Engineering & Surveying <br />200A Carbon Junctbn Mine Annual Reclamation Report Page 2 <br />CDMG Pennft C-92-O80 <br />