Laserfiche WebLink
' B. SITE SPECIFIC•CLAMATION COSTS • <br />The following are estimated costs of completing the reclamation of each speci~iic site. Area <br />numbers are correlated to the map. Costs are 1992 dollars and the numbers given below <br />and throughout this section are thousands of dollars. Acreages are projected through <br />1994. Areas partially revegetated are itemized and assigned appropriate costs to complete <br />the reclamation from the present state of progress. As in the past, "buffer" represents land <br />reserved for possible future disturbance. <br />1. Mine Site (172 acres) <br />a) Dismantle $ 0 <br />b) Grading and Site Preparation 170 <br />c) Revegetate 116 acres at $2,269/acre 263 <br />d) Buffer, 56 acres 0 <br />TOTAL... $ 433 <br />2. Vent Shaft (1 acre) <br />a) Secure shaft opening $ 50 <br />b) Fertilize 1 acre at $150/acre (1 application) ~ <br />TOTAL... $ 50 <br />3. Portal Area (28 acres) <br />a) Dismantle, close portal $ 35 <br />b) Revegetate 3 acres at $1,619/acre 5 <br />c) Fertilize 25 acres at $150/acre (1 application) 4 <br />TOTAL... $ 44 <br />4. Surface Railroad (121 acres) <br />a) Dismantle $ 5 <br />b) Grading and Site Preparation 63 <br />c) Revegetate RR bed, 36 acres at $2,269/acre 82 <br />d) Fertilize slopes, 73 acres at $150/acre (1 application) 11 <br />e) Buffer, 12 acres 0 <br />TOTAL... $ 161 <br />5. Mill Yard and Access Roads (123 acres) <br />a) Dismantle $ 0 <br />b) Grading and Site Preparation 127 <br />c) Revegetate yard, 95 acres at $1,619/acre 154 <br />d) Buffer, 28 acres 0 <br />TOTAL... $ 281 <br />6. East Branch Reservoir Shores (100 acres) <br />a) Dismantle $ 0 <br />b) Revegetate, 4 acres at $1,619/acre 6 <br />c) Fertilize shores, 41 acres at $150/acre (1 application) 6 <br />d) Buffer, 55 acres ~ <br />TOTAL... $ 13 <br />