My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP18558
DRMS
>
Back File Migration
>
Report
>
REP18558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:47:23 PM
Creation date
11/27/2007 2:26:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/8/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Henderson Mine, Permi• M-77-342 • <br />• Reclamation Costs <br />Page 2 <br />2. Cost per acre to reclaim areas with a subsoil growth medium such 2s the portal <br />area, reservoir shores, power lines, etc. <br />ACTIVITY MAN <br />DAYS LABOR/ <br />EQUIPMENT MATERIAL TOTAL <br />Scarification and/or <br />Ripping 0.5 $ 400 $ 0 $ 400 <br />300 Trees 2 120 110 230 <br />40 Shrubs 1 145 60 205 <br />Seed 0.5 130 150 280 <br />Fertilizer 0.5 20 20 <br />Freight and Tax (10% of <br />Material costs) - - - 34 <br />Maintenance Fertilize (3 <br />applications) 3 390 60 450 <br /> TOTAL (per acre)... $ 1,619 <br />* Included with seed application. <br />3. Cost for revegetating one (1) acre of tailing. <br />• Revegetate at $1,619 (See item 2) <br />• Topsoiling ($2.00/cy, 1,613 cy/acre) <br />• Liming (2 tons/acre) <br />4. Cost per acre for maintenance fertilization. <br />Total (per acre). <br />$ 1,619 <br />$ 3,226 <br />$ 216 <br />$ 5,061 <br />• Contracted out for $150/acre including material. <br />Total (per acre)... $ 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.